Exposed Brick, Concrete & Room-Aware Composition
The industrial concept is built around the visible room, so brick, concrete, and microcement finishes follow the existing composition rather than floating over a generic template. For lofts, 10–16 ft (3.0–4.9 m) ceilings support exposed trusses and full-height brick. In standard 8–9 ft (2.4–2.7 m) rooms, use vertical brick coursing, lighter concrete tones, and low-profile furniture to avoid visual compression.
